Laserfiche WebLink
III. COMMENTS - COMPLIANCE <br /> Sunlight C-1981-046 <br /> Pg 1/1 23 March 2010 <br /> Below are comments on the inspection. The comments include discussion of observations <br /> made during the inspection. Comments also describe any enforcement actions taken <br /> during the inspection and the facts or evidence supporting the enforcement action. <br /> This was a complete inspection of the Sunlight Mine conducted on 23 March 2010 by <br /> Jim Stark of CDRMS. The permit for the site has been revoked and the reclamation <br /> was completed by the Division. The weather was cold and it was snowing. There <br /> was approximately six inches of snow on the ground at the time of the inspection. <br /> The lower portal are of the mine was inaccessible at the time of the inspection due to <br /> the amount of snow on the ground. An attempt will be made to inspect this part of <br /> the mine (and the portal backfill failure) in April. <br /> Signs and Markers: The Division's revoked mine project sign was along the County <br /> Road at the upper portal location of the site. The sign was in good condition. <br /> Backfilling and Grading: - The regraded upper portal and road area were covered <br /> with approximately six inches of snow at the time of the inspection. Although the <br /> snow was pretty deep, there did not appear to be any maicLr settling or sliding of the <br /> backfill at this time. This area will be inspected again in the late spring/early summer <br /> once the snow has melted for a more complete determination of the sites condition. <br /> This completes the 23 March 2010 inspection of the Sunlight Mine, <br />