My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-25_PERMIT FILE - M2009076 (24)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009076
>
2009-09-25_PERMIT FILE - M2009076 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:47 PM
Creation date
4/7/2010 12:45:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
PERMIT FILE
Doc Date
9/25/2009
Doc Name
New 110d DMO Appl.- Part III
From
Venture Resources, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> <br />• <br />To summarize this Schedule, the amount of the Financial Warranty Cash Bond for the previously defined Maximum <br />Disturbance - Bench #2 shall be: <br />Total Reclamation Cost for Maximum Disturbance - Bench #2 as <br />defined in Exhibit D, 6.3.4(2): Tailings & Mobile Mill Site <br />Tailings Impoundment Maximum Disturbance - Bench #2 $34,496.02 <br /> <br />Mobile Mill Site Maximum Disturbance $3,085.00 <br /> <br />Additional 5% DRMS Office Admin., per 6.3.4 2 c $1,879.05 <br />Total Reclamation Cost for Maximum Disturbance - Bench #2 $39,460.07 <br />An adjustment of the standing bond shall be made to reflect continuing operations forward of Bench #2 to total <br />build-out, more specifically the completion through Bench #5 (scheduled to occur at 90 months/7.5 years): <br />Additional Bond Requirement to Proceed from Bench #2 thru <br />Total Build-out of Bench #5 <br />Tailings Impoundment Maximum Disturbance - Bench #5 $52,093.27 <br /> <br />Tailings Impoundment Maximum Disturbance - Bench #2 $34,496.02 <br /> <br />Difference Bench #5 - Bench #2 $17,597.25 <br /> <br />Additional 5% DRMS Office Admin., per 6.3.4 2 c $879.86 <br />Total Bond Adjustment for Maximum Disturbance - Bench #5 $18,477.11 <br />Refer to the Reclamation Cost Schedule in the following appendix for more detailed information. <br />Appendix to Exhibit D <br />• Clear Creek County Mining District Zoning Regulations <br />• Phelps Dodge Climax Mine Reclamation Project <br />• Arkansas Valley Seed Co. "Mountain Mix" seed specification <br />• Reclamation Cost Schedule <br />• Tailings Impoundment Capacity <br />• Letter from Doyle Construction, Inc. regarding third party contractor reclamation <br />¢42189 <br /> <br />7
The URL can be used to link to this page
Your browser does not support the video tag.