Laserfiche WebLink
• • 9 <br />VIRGINIA CANYON WASTE ROCK DATA <br />Site # Description pH EC Acidity As Cd Cu Fe Pb Mn Zn <br /> s.u. US m /I u /I u /I ug/I u /I ug/I u /I u /I <br />34 Old Proverb Mine (Little 6 #3) 3.16 849 184 BDL 140 BDL 2300 BDL 15000 10000 <br />35 Early Bird (Little 6 #3) 3.01 873 178 BDL 42 160 740 BDL 11000 6300 <br />36 Remington Tunnel 4.59 5050 112 BDL 300 260 190 BDL 39000 37000 <br />37 Jenny Lind (Little 6 - #4) 2.61 1178 198 BDL 59 790 3200 180 6100 10000 <br />38 West Dump in first drainage above 3-way 3.37 255 55 BDL 29 360 BDL BDL 200 5300 <br />39 East Dump in first drainage above 3-way 3.71 115 27 BDL 15 34 BDL 120 130 2200 <br />40 Bullion Tunnel 3.27 478 , 104 BDL 130 330 140 2800 4500 , 20000 <br />42 Bride Tunnel 2.43 2550 1128 860 270 5300 210000 2300 34000 44000 <br />43 Metropolitan and Kangaroo Mines 3.44 213 48 BDL 45 98 BDL 1200 460 7700 <br />44 Boreas Mine 3.18 581 97 B D L 120 1100 120 190 1500 18000 <br />45 Inter Ocean Mine 3.43 893 108 BDL 76 590 50 400 5800 13000 <br />46 Boreas Inter Ocean 3.44 375 45 BDL 39 170 850 BDL 860 6700 <br />47 Upper Dump west of Rattler 3.45 203 38 BDL 10 100 BDL BDL 640 , 1700 <br />48 Lower Dump west of Rattler 3.32 342 58 BDL 23 130 290 400 1700 3900 <br />49 Dump west of Needham Adit -3.2 -303 53 BDL 10 120 160 620 1100 1900 <br />50 Dump Northwest of Seaton 3.06 451 106 BDL 57 1000 800 2800 770 8600 <br />51 Ottawa Mine 3.18 472 128 BDL 80 580 310 67 15000 11000 <br />52 Dump east of Needham Adit 2.98 1432 388 BDL 130 BDL 2000 570 130000 21000 <br />53 Casino Mine 2.82 2100 577 BDL 360 6300 6200 53 180000 53000 <br />54 Shaft at Gilson Gulch Turnoff 3.81 169 21 BDL BDL 32 BDL BDL 1500 520 <br />55 Pine Shade Shaft 3.13 593 96 BDL 120 760 130 1300 10000 18000 <br />56 Sunny Side Shaft 2.79 1111 176 BDL 110 1200 590 530 22000 19000 <br />57 Shaftt above Gilson Gulch Road in drainage 3.35 143 35 BDL 7.9 59 170 72 4600 960 <br />58 Large dump above Gilson Gulch Road 2.58 1812 678 BDL 56 1000 51000 180 9900 8800 <br />59 Dump above Franklin Turnoff 3.53 177 26 BDL 5.9 150 BDL BDL 770 860 <br />60 Harpoon Shaft 3.99 334 29 BDL 33 150 98 BDL 14000 4700 <br />61 Western Shaft on Harpoon Vein 3.99 62 23 BDL BDL 54 120 BDL 590 210 <br />63 Mine Below Road at Gilson Gulch Turnoff 3.57 212 36 BDL 39 230 BDL BDL 6100 4900 <br />64 Shaft west of Pine Shade 2.7 1394 564 BIL , <br />730 2000 19000 2100 3100 110000 <br />65 Shaft East of Seaton 2.86 1085, 376 BDL 260 720 10000 2000 2900 43000