My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-06_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2010-04-06_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:26 PM
Creation date
4/6/2010 1:02:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
4/6/2010
Doc Name
Email Regarding Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
TR67
Email Name
JRS
SB1
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk Creek Mine C-1981-022 <br />Tarhnirral Ravicinn R7 <br />PROJECT IDENTIFICATION <br />Date : 06-Apr-10 Permit C-1981-022 Site: Elk Creek Mine <br />User: JRS State : Colorado <br /> Filename: C022-240 County: Delta <br />Agency Name: Colorado Division Of Reclamation, Mining and Safety <br />Permit Action: Technical Revision 67 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />241 Plug and Seal 9 Exploration Holes 18.00 $4,750 <br />242 Regrade 9 Drill Pads 16.59 $3,345 <br />243 Regrade Light-Use Roads 13.21 $2,663 <br />244 Replace Topsoil from Stockpile to 9 Drill Pads 9.39 $1,893 <br />245 Replace Topsoil from Stockpile to Light-Use Roads 7.57 $1,525 <br />246 Reseed 9 Drill Pads 4.50 $1,877 <br />247 Reseed Light-Use Roads 3.54 $1,477 <br /> <br /> Direct Cost Total 72.80 $17,530 <br /> <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) $354 <br /> Performance Bond (1.05% of Direct Costs) $184 <br /> Job Superintendent (at $52.10/hour) 36.40 $1,896 <br /> Profit (10.00% of Direct Costs) $1,753 <br /> <br /> Total Overhead and Profit $4,188 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $21,718 <br /> <br /> <br /> Le ag 1- En ing eering - Project Management <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $923 <br /> Reclamation Management and Administration (3.25% of Contract) $706 <br /> <br /> TOTAL BOND AMOUNT $23,346 <br />jrs Page 1 06-04-10
The URL can be used to link to this page
Your browser does not support the video tag.