My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-01_REVISION - C1980007 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2010-04-01_REVISION - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:11 PM
Creation date
4/6/2010 8:42:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
4/1/2010
Doc Name
2nd Adequacy Review (Memo)
From
Marcia Talvitie
To
Tom Kaldenbach
Type & Sequence
TR120
Email Name
TAK
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-1980-007 TR-120 <br />2nd AR - MLT <br />O1-Apr-2010 <br />Page 3 of 3 <br />20. A minimum static safety factor of 1.5 is required by 4.10.4(2). The "Permit Design" <br />configuration modeled in Figures 2-9 and 2-10 of the original application resulted in a <br />static Factor of Safety of 1.82 and a seismic Factor of Safety of 1.58. These factors may <br />be reduced slightly by the change in friction angle for the refuse material, but are still <br />likely to exceed the requisite values. Please revise the Permit Design model runs of <br />Figures 2-9 and 2-10 to reflect the change in refuse friction angle derived from the LAP <br />investigation. <br />MCC's 23 March response indicates that additional model runs were completed. <br />The results are reflected in the revised text of Section 2.2. However, the electronic <br />submittal did not include revised Figures 2-9 and 2-10 for the "Permit Design" <br />configuration. <br />Please provide updated versions of Figures 2-9 and 2-10, reflecting changes made to <br />the model, for inclusion with Exhibit 82. <br />General Review Comments <br />21. 2.1- Geotechnical Investigation describes the soil and rock borings drilled for the <br />borehole locations for the RPE East investigation are shown on Drawing No. C-02 in <br />Appendix D. For ease of reference, it would be helpful if the same (or a similar) drawing <br />were also included as Figure 1-3. Please add Figure 1-3 to Volume IOC, illustrating the <br />borehole locations for the RPE East geotechnical investigation. <br />MCC's 23 March indicates that Figure 1-3 has been added, but the figure was not <br />included with the electronic submittal. <br />Please ensure that Figure 1-3 has been or will be provided for incorporation into <br />Exhibit 82. <br />22. The last two sentences of 2.2.3.1 Refuse Pile Configuration refer to Figure 2-5 and Figure <br />2-6, respectively. The first reference should be to Figures 2-5 and 2-6, while the second <br />should be to Figures 2-7 and 2-8. Please ensure that the intended figures are referenced <br />in this subsection. <br />The text has been corrected. Item resolved; no further action is required. <br />This concludes my second adequacy review for TR-120 at the West Elk Mine. Please do not <br />hesitate to contact me with any additional questions that you may have. <br />cc: Sandy Brown, DRMS
The URL can be used to link to this page
Your browser does not support the video tag.