Laserfiche WebLink
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name: DBMS <br />Task # : 04a State :Colorado Permit/job #: P-2009-038 <br />Date : 0313012010 <br />User: THM <br />sheet 1 of 2 <br />Permit or other job action :Drilling Project <br />Task description :Mobilization to and from site <br />........ .................................... <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />KInKI_OnnnARI G Fnl IIPMRNIT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat 318C L 21.66 $24.27 $88.67 1 $112.94 $88.67 $250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $112.94 $88.67 $250.00 <br />County :Ouray Abbreviation :none <br />Site : Ruby Trust Mine Filename : P038-04a