My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-01_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-04-01_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:11 PM
Creation date
4/5/2010 8:20:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
4/1/2010
Doc Name
Adequacy Review & Cost Estimate
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
MR116
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 241 <br />Date : 0410112010 <br />User : JRS <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Permit/job# : C-1996-083 <br />Abbreviation :none <br />Filename : C083-241 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety _ <br />Permit or other job action : Minor Revision 116 <br />Task description : Regrade Terror Creek Light-Use Road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.77 NA <br />Operating cost/hour : $95.29 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $201.60 Total fl eet cost/hour : $201.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,800 CCY factor : 1.125 volume : 11,025 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 0.90 _ (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br />Visibility: 1.00 _(avg.) _ <br />Material consistency description : Job efficiency : 0.83 (1shiff1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-M <br />Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,800 feet Material weight : 0.87 (Cat HB)_ <br />Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.33 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 352.35 LCY/hr <br />Adjusted fleet production : 352.35 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 31.29 Hours <br />Unit cost : $0.572 /LCY Total job cost : $6,308
The URL can be used to link to this page
Your browser does not support the video tag.