My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-26_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2010-03-26_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:02:41 PM
Creation date
4/1/2010 10:13:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
3/26/2010
Doc Name
Intent to File a Civil Suit
From
JoEllen Turner
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
SB1
MLT
DAB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VL.,� � Pro osed Decision <br />Ie <br />The Colorado Division of Reclamation, Mining and Safety proposes to approve this application <br />for permit renewal RN -05. <br />The application was submitted by Western Fuels - Colorado for the New Horizon mine. This <br />decision is based on a finding that the operations will comply with all requirements of the <br />Colorado State Program as found in the Colorado Surface Coal Mining Reclamation Act, Section <br />34 -33 -101 et seq., C.R.S., and the Regulations promulgated pursuant to the Act. If no request for <br />a formal hearing is made within thirty (30) days of the first publication of the issuance of this <br />proposed decision, then this decision becomes final. Upon submittal of acceptable surety by the <br />applicant, the permit will be issued. The permit application, all supporting documentation and <br />any stipulations or Conditions will become a binding pail of th permit. <br />Western Fuels- Colorado has complied with all previous conditions and stipulations from other <br />permitting actions. <br />Two new Stipulations are attached to the permit as a result of this permit renewal (RN -05). The <br />two stipulations are listed below, as well as in Section B.VIII (Postmining Land Use) and <br />Section B.XI (Prime Farmlands) of the RN -05 Findings of Compliance. <br />STIPULATION NO. 16 <br />• WITHIN 30 DAYS FOLLOWING ISSUANCE OF THE FINAL DECISION FOR <br />PERMIT RENEWAL NO. 5, THE PERMITTEE WILL SUBMIT A PERMIT REVISION <br />APPLICATION TO THE DIVISION THAT INCLUDES COMPREHENSIVE <br />AMENDMENTS TO THE SITE DESCRIPTION AND LAND USE, VEGETATION <br />INFORMATION, PRIME FARMLAND INVESTIGATION, REVEGETATON, <br />POSTMINING LAND USES, AND PRIME FARMLANDS SECTIONS OF THE PERMIT <br />APPLICATION. AT A MINIMUM, THE REVISION APPLICATION WILL <br />SUBSTANTIVELY ADDRESS ALL OUTSTANDING CONCERNS IDENTIFIED BY <br />THE DIVISION IN REVIEW LETTERS AND MEMORANDA DATED DECEMBER 23, <br />2005, NOVEMBER 6, 2006, DECEMBER 7, 2007, AND JANUARY 14, 2008. <br />STIPULATION NO. 17 c1S �� <br />�i' r' y <br />UNLESS THE PERMITTEE DEMONSTRATES THAT SOME PORTION OF THE <br />107.96 ACRE AREA OF PRESUMED PRIME FARMLAND ON THE MORGAN <br />PROPERTY WITHIN THE PERMIT AREA DOES NOT MEET PRIME FARMLAND <br />CRITERIA BASED ON ONE OR MORE OF THE FACTORS LISTED IN RULE 2.04.12, <br />THE ENTIRE 107.96 ACRE AREA IS CONSIDERED PRIME FARMLAND IN <br />ACCORDANCE WITH DRMS REGULATIONS, AND WILL BE RECLAIMED AS <br />CROPLAND IN ACCORDANCE H T E REMENTS OF RULE 4.25. <br />--- <br />`� <br />P 4 't'i ,roc` `) Y� r�9 +� <br />
The URL can be used to link to this page
Your browser does not support the video tag.