Laserfiche WebLink
Hayden Gulch Terminal, LLC <br />RECEIVED <br />March 31, 2010 <br />Ms. Janet Binns <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />(303) 866-3567 <br />RE: Hayden Gulch Terminal, LLC <br />Hayden Gulch Loadout, Permit No. C-92-081 <br />2009 Annual Reclamation Report <br />Dear Ms. Binns, <br />MAR 3 9 2010 <br />Division of ntliT?a#i??i, <br />Mining and Safety <br />On behalf of Hayden Gulch Terminal, LLC., attached please find two copies of the 2009 Annual Reclamation Report <br />for Hayden Gulch Loadout Facility. This report is submitted pursuant to Rule 2.04.13 of the Regulations of the <br />Colorado Mined Land Reclamation Board for Coal Mining. In Tab 20, Revegatation Plan, of the approved Operations <br />and Reclamation Plan, on page 11, under the Annual Reporting Subsection, the text states "The Annual Reclamation <br />Report will be submitted by March 30 of the year following reclamation or activity monitoring..." <br />Should you or any of the CDRMS staff have questions regarding this report, please contact me at (970) 276-5217 or <br />846-3648. <br />Since ely, <br />Roy Karo <br />Reclamation Manager <br />Hayden Gulch Terminal, LLC <br />cc: Brian Dunfee, Peabody Energy <br />Hayden Gulch Terminal, LLC • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276-5217 • FAX (970) 276-5222