Laserfiche WebLink
Map 19D - Slope Zone Analysis Postmining & Pre-mining topography is also <br />provided in this submittal to document the frequency of various slopes on the pre-mining <br />and post-mining surface, This analysis is based on 100 foot grid interval calculations. <br />Rule 4.15.7 - Determining Revegetation Success: General Requirements and Standards <br />33. Colowyo states that this section is addressed in Volume 1. Rule 4.15.7 sets forth the <br />general requirements and standards for Determining Revegetation Success. The <br />reference to Volume 1 is considered incomplete because the Collom expansion area is <br />not included in Volume 1. If Colowyo is proposing to use the reference areas <br />described in Exhibit 10, the details required by Rule 4.15.7 for the Collom expansion <br />area need to be correctly referenced and addressed. <br />Colowyo Response: <br />Section 4.15.7 has been amended. <br />Rule 4.15.8 - Revegetation Success Criteria <br />34. This section of the PR-03 submittal is incomplete. Section 4.15.8 of the PR-03 <br />application references the currently approved permit document which is based on <br />disturbance in the existing permit boundary. With TR-72, the revegetation success <br />criteria for the existing permit area are currently under review by the Division. Many <br />of the concepts under review in TR-72 may be applicable for the Collom area, but the <br />Collom revegetation success criteria must be site specific, and be based upon the pre- <br />mining land-uses, soil surveys, vegetation characteristics and wildlife usage within <br />the Collom expansion area. <br />Colowyo Response: <br />Section 4.15.8 has been amended. <br />Rule 4.16 - Post-Mining Land Use <br />35. This section is based on the pre-mining land uses described in Section 2.04.3. The <br />narrative in Section 2.04.3 of the PR-03 submittal is incomplete as it does not provide <br />details on the Collom expansion area. This section must be completed to specifically <br />address the Collom expansion area. <br />Colowyo Response: <br />Section 2.04.3 has been amended. <br />Rule 4.18 - Protection of Fish, Wildlife and Related Environmental Values <br />36. This section of the PR-03 submittal is incomplete. Colowyo references pending TR- <br />72 which is based on the existing permit boundary; the Collom expansion area is not <br />considered in TR-72. The specifics of 4.18(5) (d) and (i) subsections (i) and (ii) are <br />Colowyo Mine C-1981-019 page 14 of 16 25 March 2010 <br />Permit Revision 03 - Collom Permit Expansion