Laserfiche WebLink
SFANNON6WILSORINC <br />l0J> LIMITATIONS <br />0 <br />This report was prepared for the exclusive use o[�C(.'-Co|nv Mine for planning and <br />construction of the temporary spoil till and sedimentation pond embankment. <br />'rhe analyses, conclusions, and recommendations contained in this report are based on site <br />conditions as they presently exist. We ftirthcrassume that the current explorations are <br />representative of the subsurface conditions u1 the site. !fdo6ngeonshncbocauboorOscc <br />conditions different frorn those encountered in the explorations or described in this report, are <br />observed or appear to be present beneath the site, we should be advised at once so that we can <br />review these condition� and reconsider our recommendations where necessary. <br />Within the limitations of the scope., schedule and budget, the analyses, conclusions and <br />recommendations presented in this report were prepared in accordance with generally accepted <br />professional geotechnical engineering principles and practice in this area at the time we prepared <br />our report. Wc make no other warranty, either express orimplied. Theoa conclusions and <br />recommendations were based ou Our uudemuandivauf<he project umde»cribcdiot6iarcpoduud <br />the site conditions os interpreted from the current explorations. <br />The scope of our services did not include any environmental assessment mevaluation regarding <br />the presence or absence of wetlands or hazardous or toxic materials in the soil, surface water, <br />groundvvu^er, or air. on or below thesite, or for evaluation for disposal of contaminated soils or <br />groundwater, should any boencountered. <br />SHANNON & WI <br />Mar2kG. 'ray, P.F <br />Senior Associate <br />Qj <br />[a <br />23-1-01101-400 <br />Bub. 23'l-23 Revision Date: 08/05/09 <br />Revision No.: PR-03 <br />