Laserfiche WebLink
EXHIBIT 7, ITEM 25 <br />COLLOM POSTMINE CHANNEL DESIGN <br />The location of the Collom postmining drainage channels are presented on Map 41B. The <br />following figures have been prepared to show the individual subbasins: <br />Exh. 7, Item 25, Figure 1 <br />Exh. 7, Item 25, Figure 2 <br />Exh. 7, Item 25, Figure 3 <br />Exh. 7, Item 25, Figure 4 <br />Exh. 7, Item 25, Figure 5 <br />Exh. 7, Item 25, Figure 6 <br />Exh. 7, Item 25, Figure 7 <br />Exh. 7, Item 25, Figure 8 <br />Exh. 7, Item 25, Figure 9 <br />Exh. 7, Item 25, Figure 10 <br />Exh. 7, Item 25, Figure 11 <br />Little Collum Reach 1 and Trib. 2 Draws <br />Little Collum Reach 2 and Trib. 3 Draws <br />Little Collum Reach 3 <br />Deer & Little Deer Draw <br />Elk and Trib. 4 Draws <br />Porcupine Draw <br />Cougar Draw <br />Badger, Marmot, & Weasel Draws <br />Bear Draw <br />Little Bear, Trib. 6, Little Fox 1, & Little Fox 2 Draws <br />Red Fox & Trib. 5 Draws <br />Channel profiles for these structures showing channel lengths and elevation changes are <br />presented on Map 33, Sheets 1 through 3. <br />A SEDCAD analysis is attached for each of the subbasins. Table 1 provides a listing of the <br />individual analyses. Given the size of the drainage area for the Little Collum reaches, a design <br />storm of 100 year, 24 hours was used. All other design events is based on the 10 year, 24 hour <br />storm. <br />All of the basins are assumed to be completely finished with the entire drainage area contributing <br />to flow. As such, a curve number of 75 was used for all basins. As noted in Volume 2D, <br />"Methodologies and Assumptions for Sediment Pond Design Evaluations ", as modified by TR- <br />73, this curve number assumes that about 50 percent of the area is reclaimed for less than 2 years <br />and 50 percent of the corresponding drainage is reclaimed for three or more years. As such, this <br />analysis is expected to predict long term flows on the reclaimed area. As noted on Map 29B, <br />spoil grading and subsequent reclamation activities are expected to proceed southward over a <br />number of years and it will generally take several years before an individual basin is <br />contributory. <br />All postmining channels listed will be riprapped using material size and design methods <br />specified in Volume 2C, Exhibit 14H. Except as noted below, all channels will have a <br />completed width of 12 feet, 3H:1 V sideslopes, and a total depth of 3.0 feet. The Little Collum <br />Reach 2 and Reach 3 will have a completed width of 20 feet, 3H:1 V sideslopes, and a total depth <br />of 4.0 feet. <br />• <br />Exh. 7 -25 -1 Revision :Date: 03/25/10 <br />Revision No.: PR -03 <br />