My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (83)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (83)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:07 PM
Creation date
3/30/2010 10:14:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
12/17/2010
Doc Name
Exhibit 6 Item 10 Cross-Section B-B Drill Holes
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRILL HOLE INFORMATION FORM <br />Kennecott Energy - Colowyo Mine <br />i s <br />• <br />Completion_ro—Is <br />Project: Colowyo Collom 2006 Exploration <br />Logging Company: Century Geopysical Logger Name: <br />Hole ID: <br />C-06-06 <br />Colowyo Project Manager: Juan Garcia <br />Hole Type (pilot, spot core, full core, well, geotech, etc.): <br />Geologist (Company): Michael Neville <br />Date Hole Started: <br />1/12/2006 <br />Date Hole Finished: <br />1/12/2006 <br />Easting: 132990.21 Northing: <br />11-11,11,11, ......... ... _... <br />350807.64 <br />Ground Elevation: <br />7267.71 TD: <br />_. . <br />581 <br />Location Qtr /Qtr, Section,T & R ) : _._......... <br />............... ._........... <br />Geomechamcal Testing <br />Depth of Weathering: <br />ate ,... ,._.;..��,- ,r„d,• ._ .... <br />County and Stale: <br />Coordinate Type <br />Surveyed (y /n): <br />Date Site Reclaimed: <br />Backfill Materials and Depths: <br />Number of bags used. 12 plug gel; 35 bags bentonite chips <br />Surface Reclamation <br />Drilling <br />Groundwater <br />Static water Level (Log): Inflow (depth & production estimates): Considerable inflow encountered <br />initially at 100 feet and steadily increasing; @ 100 ft inflow– gpm; @ 340 ft inflow – 15 gpm; 580 ft inflow – 30 gpm. <br />Drilling Company: <br />Rig Type: <br />Failing <br />Driller: <br />Lawrence Martin <br />Surface Casing Type & Size: <br />Interval Depths: <br />Other Casing Runs: <br />Interval Depths: <br />Casing Recovered (y /n): <br />Drilling Methods: <br />Hole & Core <br />Rotary or Core From <br />To <br />Diameter <br />Bit Type <br />Ream Interval <br />Rotary 0 <br />19 <br />8 3/4 <br />19 <br />Rotary 19 <br />581 <br />5 3/4' <br />562 <br />Drilling Medium: <br />From To Medium and Additives: <br />0 19 A <br />1 9 581 <br />Air w /soap injection <br />Circulation & Hole Problems (depth lost, regained, etc.): <br />Logging: <br />Logging Company: Century Geopysical Logger Name: <br />Robert Sipes Probe Depth: 579.2 <br />Date Hole Logged: 1/12/2006 Logging Suite: <br />Gamma Density, Caliper, Resitivity, , Deviatwn Temp <br />Digital Log Format: LAS Other <br />Sampling & Testing <br />Sampling Information (cuttings frequency, spot coring, etc.): <br />5 cuttings for descriptions only <br />__ <br />Coal Laboratory: <br />............. __ . ........... <br />Overburden Laboratory: <br />Gas Testing: <br />Geomechamcal Testing <br />ate ,... ,._.;..��,- ,r„d,• ._ .... <br />...�,. ...,, _. „ , .. <br />Hole Completion & Reclamation <br />Date Hole Plugged: 1/13/2006 <br />Date Site Reclaimed: <br />Backfill Materials and Depths: <br />Number of bags used. 12 plug gel; 35 bags bentonite chips <br />Surface Reclamation <br />Groundwater <br />Static water Level (Log): Inflow (depth & production estimates): Considerable inflow encountered <br />initially at 100 feet and steadily increasing; @ 100 ft inflow– gpm; @ 340 ft inflow – 15 gpm; 580 ft inflow – 30 gpm. <br />Well Installation Details <br />(Comments <br />Page of <br />
The URL can be used to link to this page
Your browser does not support the video tag.