Laserfiche WebLink
DRILL HOLE INFORMATION FORM <br />Kennecott Energy - Colowyo Mine <br />• <br />• <br />1 I 11 <br />u <br />Project: Collom <br />.. <br />Hole ID <br />C-04-13 <br />Colowyo Project Manager: <br />Juan Garcia <br />Hole Type (pilot, spot <br />core, full core, well, geotech, etc.): <br />Full Core <br />Geologist (Company): <br />Brant Dennis <br />Date Hole Started: <br />8130/2004 <br />Date Hole Finished: <br />9/18/2004 <br />Easting: 1329533.62 <br />Northing: <br />353997.82 <br />Ground Elevation: <br />7264.21 TD: <br />1195.6 <br />Location (Qtr /Qtr, Sectlon,T & R): <br />NW NE Section 35 3N 94W <br />......... .............. <br />Depth of Weathering: <br />= 33' <br />County and State: <br />Coordinate Type: <br />Surveyed (y /n): <br />.: <br />f ....a <br />.. S <br />Drilling: <br />Drilling Company: <br />Western American ......... <br />Rig Type: <br />Midway 1500 <br />Driller: <br />Rex Polen <br />Surface Casing Type & Size: <br />Certalok 6.9" O.D. SDR 17 <br />�..." . ._. _. <br />Interval Depths: <br />0 -19' <br />_ . ........ ... <br />Other Casing Runs: <br />None <br />_.. Interval Depths: <br />......... <br />Casing Recovered (y /n): <br />Drilling Methods: <br />Hole & Core <br />Rotary or Core <br />From <br />To <br />Diameter <br />Bit Type <br />Ream Interval <br />Rotary <br />0 <br />19 <br />8 7/8 <br />R oller <br />_.. <br />Core <br />19 <br />.. <br />846 <br />4 3/4 <br />Chris <br />. <br />Rotary <br />846 <br />1195.6 <br />43/4 <br />Roller <br />Drilling Medium: <br />From To Medium and Additives: <br />0 1s Air <br />19 1195.6 Water /Polymer <br />......_ _ <br />Circulation & Hole Problems (depth lost, regained, etc.) <br />Continuous core hole drilled w/ water & polymer to TD. No significant water loss exce <br />Had slow water loss while coring due to hiaher head pressure in hole than artesian or, <br />Logging: <br />Logging Company: Century Geophysical Logger Name Robert Sipes Probe Depth: 1195.2 <br />Date Hole Logged: 9/19/2004 Logging Suite: Gamma, density, caliper, Peroslty, (Den), Resistivity Temp, <br />........ <br />" Temp Acoustic Scanner <br />Digital Loa Format: LAS Other: <br />Date Hole Plugged: 9/26/2004 Full core Date Site Reclaimed. <br />Backfill Materials and Depths: 20 sacks plug gel, 16 sacks Bent Chips, (- 1195 -4')1 5 sacks concrete(4' to surface) <br />Number of bags used: Hole Marking Information: <br />Surface Reclamation: <br />„_....,... 'd „u�,��u:::•... .... .r,,,,.,, '< ,..,p; �. `, ..... .:wx �.., :..... .:' ",,.,z, ��eufa..... ... i. ...w,....a'kc�»,...,.... ,u...,i <br />Groundwater <br />Static water Level (Log): 233' Inflow (depth & production estimates): _5 5 10 gpm inflow to = 750' <br />increase until TD-no oroducina estimate <br />Hole Completion & Reclamation <br />Well Installation Details: <br />Comments <br />The Th first e rst hole on site was a continuous core to just above the KM( marker bed) The hole was then rotary drilled Into the Trout Creek SS <br />Aft er :first h o - _ -- _. .. <br />r plugging the hole, three monitor wells were then completed. Of the three Monitoring Wells the second well collected coal core from <br />all the seams areater than 4' thick. The third Monitoring Well core the seam Co) s 100' and the D Seam for geotech analysis. <br />Completion_form_C- 04- 1 3.xis <br />Page of <br />