My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-24_REVISION - P2009015 (2)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2009015
>
2010-03-24_REVISION - P2009015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:02:35 PM
Creation date
3/30/2010 7:39:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009015
IBM Index Class Name
REVISION
Doc Date
3/24/2010
Doc Name
Modification to an existing NOI (non-confidential)
From
Jubilee Venture
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form 2- Public) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />OJ l''Db-lam I?K?DP?. e?9%/aOD? <br />C r:O.P? ?j .? ? '^ ./-D©j QG ?j"'G1/??el??,?{??L??41? /?,il?"f..f-.fir%? ?'(i.r;•i ??? ' ?v <br />Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />/Vo <br />i <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />/?" ?'?a.` a ???"t`s3?%?l?' ?% Jl, s <.i? ;? ids ;.? • ; l ?.?•
The URL can be used to link to this page
Your browser does not support the video tag.