Laserfiche WebLink
6 (Form 2- Public) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />OJ l''Db-lam I?K?DP?. e?9%/aOD? <br />C r:O.P? ?j .? ? '^ ./-D©j QG ?j"'G1/??el??,?{??L??41? /?,il?"f..f-.fir%? ?'(i.r;•i ??? ' ?v <br />Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />/Vo <br />i <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />/?" ?'?a.` a ???"t`s3?%?l?' ?% Jl, s <.i? ;? ids ;.? • ; l ?.?•