My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-26_PERMIT FILE - P2009038 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2009038
>
2010-03-26_PERMIT FILE - P2009038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:02:43 PM
Creation date
3/30/2010 7:39:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009038
IBM Index Class Name
PERMIT FILE
Doc Date
3/26/2010
Doc Name
Response to 03/10/2010 letter
From
Charles R Ponchak
To
US Forest Service
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' <br />V <br />Charles R. Ponchak <br />Consulting Geologist <br />15292 6050 Rd <br />Montrose, CO. 81403 <br />Hm 970-249-2081 Wk 970-249-4434 <br />March 24, 2010 <br />U.S. Forest Service <br />2505 South Townsend Avenue <br />Montrose, CO 81401 <br />Attn: Tammy Randall-Parker <br />Re: March 10, 2010 letter, File Code 2820/2720/7720-2-1 <br />Dear Tammy: <br /> <br />MAR 2 2010 <br />GRAND JUNI-114., j FitLU OFFICE <br />DIVISION OF <br />RECLAkIATFOiq MINING $ SAFETY <br />MCN= <br />MAR 2 9 2010 <br />Division cr r Lclamagon, <br />Mining and Saf* <br />P - Lo oe) - O <br />This letter will constitute Mount Sneffels Mining Company, LLC response to <br />the above named letter. <br />Roads: No comment <br />Time Frame: The construction time required for each site and access road will <br />vary depending on the length and type of materials to be moved. The same <br />holds true for each drill pad. It is estimated that the average site and associated <br />access road will take 6 to 8 hours to construct. It is also estimated that between <br />8 and 12 hours will be required to reclaim the average site. Longer access roads <br />will require longer reclamation times, shorter access roads will take less time. <br />All sites will be bermed to contain runoff from thunderstorms and snow <br />melt. A temporary hole plug will be used to seal all open holes not completed in <br />one season of drilling. A plank will be placed over the plugged hole and a sign <br />will be placed in the access road warning of the uncompleted hole. <br />Drill Pads: No comment <br />Wildlife: No comment <br />Water: No comment <br />Hazardous Materials: As was previously stated no diesel fuel, gasoline, drilling <br />mud or cement will be stored at any site. <br />Prework Field Trip: Agreed
The URL can be used to link to this page
Your browser does not support the video tag.