Laserfiche WebLink
New Efik Mine Pond: 7 <br />Date: 12/3/2009 <br />EMERGENCY SPILLWAY <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? <br />Yes No <br />2). Is erosion occurring at any section of the emergency spillway? <br />Yes <br />Describe extent: <br />No 4-11- <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Elevation @top of: <br />Elevation of Water Sw <br />Elevation to top of Sed <br />OTHER OBSERVATIONS <br />No !/ <br />/D <br />ccf'? <br />0H <br />A,1A <br />MSHA Qualified Impoundment Inspector Professional Engineer Directing InsPbcfPSAJ <br />i v .t ^:.??s LAS L? <br />Date Date <br />{ <br />Page 2 of 2?? <br />1 s ? V`eSU.?'t- ? e? Oac? cWo2?r.? ? e D??