Laserfiche WebLink
March 22, 2010 <br />Horse Gulch Fill Quarterly Inspection Report <br />First Quarter of 2010 <br />Table of Contents <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />2.2 Placement of Underdrainage Systems <br />2.3 Installation of Surface Drainage Systems <br />2.4 Placement and Compaction of Fill Materials <br />2.5 Revegetation <br />3.0 References <br />Appendix A - Drawings <br />I certify that this report was prepared by me. <br />?p• LICENSE <br />??.•P?STIN P?j?s O <br />4 4f : w <br />I <br />,o'•. 3'22 .? c,? <br />??FFS310NP?'?? <br />PROFESSIONAL SEAL <br />Seth Austin Puls <br />CO PE 41406 <br />Senior Engineer <br />Trapper Mining, Inc. <br />2 <br />2 <br />2 <br />2 <br />9 <br />9 <br />11 <br />11 <br />12 <br />1