My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-22_REPORT - C1994082 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1994082
>
2010-03-22_REPORT - C1994082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:02:22 PM
Creation date
3/29/2010 10:49:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REPORT
Doc Date
3/22/2010
Doc Name
2009 Annual Hydrology Report
From
Seneca Coal Company
To
DRMS
Annual Report Year
2009
Permit Index Doc Type
Hydrology Report
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
monitored weekly for flow and pH. All five NPDES sites are monitored <br />monthly for NPDES parameters and field parameters. Samples obtained at <br />these stream and NPDES sites are analyzed for the surface water <br />parameter list, Table 10, during April, May or June, and September. <br />Spring sites are monitored in the spring season. The current surface <br />water and spring monitoring program is presented in Table 15-9 of the <br />Yoast Mine PAP. <br />All surface water data collected during this reporting period are <br />provided in Appendix D. Data for each site begins with a flow hydrograph <br />of all historic data (plus an annual hydrograph for NPDES sites), <br />followed by a listing of individual water quality and quantity data for <br />i <br />the current water year, and followed by remarks if present. This is <br />followed by a TDS regression plot using the LOWESS method (see the <br />Ground Water Quality section), and a listing of historic percent <br />milliequivalent values for major ions and TDS values. A statistical <br />report representing baseline (i.e., premining) data for each site <br />downstream of mining (when available) is provided in Appendix Dl. On <br />this statistics report, "censored data" refers to analytical values that <br />were below the detection limit, which were censored from the <br />min/max/mean calculations. The time frame for baseline conditions is <br />listed under "conditions specified" at the bottom of each page. <br />Sage Creek <br />- Site YSSF3. This site exists on Sage Creek upstream of all potential <br />Yoast Mine discharges. This year, flow was observed in September for the <br />first time since 1999. It displays a decreasing TDS trend. <br />- NPDESI2. Mining in this basin began in 2000. Reconstruction of the <br />water augmentation Pond Y1 (Site YSSF2) was completed on September 13, <br />1999. It is now referred to as Pond 012 (NPDESI2). This pond began to <br />flow again (after reconstruction) in April 2000. Flow at this pond is <br />continuous. The average flow value for this year was 0.1434 cfs, which <br />was 65% greater than the historic (2000-2009) average for Pond 012, <br />0.0867 cfs, and was 11% greater than the Pond Y1's historic (1991-1999) <br />9
The URL can be used to link to this page
Your browser does not support the video tag.