My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-22_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2010-03-22_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:02:23 PM
Creation date
3/29/2010 10:32:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
3/22/2010
Doc Name
Review Letter
From
USDA Forest Service
To
DRMS
Type & Sequence
TR64
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. In addition to, or in replacement of traditional sediment control measures, use of natural sediment <br />control measures such as, vegetative slash, surface roughening, straw mulch, site containment and <br />sediment control ponds will be utilized on NFS lands. <br />13. Any hay or straw used shall be certified as weed free. <br />operations in inventoried Roadless Area <br />14. The surface width of temporary roads will not exceed 14 feet, except in locations which require <br />curve widening. These locations must be identified on the ground and accepted by the District Ranger. <br />15. Temporary road construction will use the end-haul construction techniques. No sidecasting of <br />material will be permitted. <br />16. All new temporary roads will be gated and locked, and closed year-round to the public. <br />17. All new access roads constructed for the sole use of this project will be decommissioned by full <br />obliteration when no longer needed for the project and reclaimed. <br />Roads <br />18. All road use and maintenance on the Forest Service system roads must be performed according to <br />Oxbow's existing Forest Service Road Use Permit. <br />19. Road Packages for existing and new roads will be prepared by an engineer licensed within the state. <br />The roads will be designed and constructed to provide maximum stability, ensure the safety of the <br />various users and protect the surface resource. The packages will be submitted to the FS for acceptance <br />prior to any construction activity. Best Management Practices will be used in designing the roads and <br />during construction. All roads will be upgraded or constructed to USFS specified standards for either <br />temporary or classified roads, as appropriate and accepted by the USFS, with a design speed of 15 miles <br />per hour. <br />20. Sections of temporary roads with roadway gradient in excess of 12 percent or soft areas, which <br />exhibit rutting in excess of 3 inches, shall be stabilized by placing an adequate depth of 3-inch minus <br />clean crushed rock. The surface of the road shall be maintained to minimize ruts and provide for sheet <br />drainage across the roadway. <br />21. The FS officer may require surfacing of temporary roads where justified by conditions or traffic <br />volumes. <br />22. The Operator is responsible for using appropriate MUTCD traffic control devices when any heavy <br />equipment is moved on publicly accessible Forest Roads, and will post warning signs, at locations <br />designated by the FS, to warn the public of increased traffic on roads resulting from project activities. <br />Additional security and public safety measures may be considered and required by the District Ranger. <br />Fire, Health and Safety <br />23. The Operator will comply with any fire restrictions in effect at the time of proposed operations. The <br />Forest Service reserves the right to suspend operations during periods of high fire potential. Forest <br />Service will provide the operator as much advance notice of anticipated closure orders as possible.
The URL can be used to link to this page
Your browser does not support the video tag.