Laserfiche WebLink
Kathy Welt <br />March 19, 2010 <br />Page 6 <br />22. The last two sentences of 2.2.3.1 Refuse Pile Configuration refer to Figure 2-5 and Figure 2- <br />6, respectively. The first reference should be to Figures 2-5 and 2-6, while the second should <br />be to Figures 2-7 and 2-8. Please ensure that the intended figures are referenced in this <br />subsection. <br />In addition to the above revisions prepared in response to CDRMS comments, we have also updated <br />the following drawings as part of the RPE East designs: <br />• Drawing C-08: Revised haul road plan for Haul Roads 1, 2, and 3. <br />• Drawing C-09: Revised haul road plan for Haul Road 4. <br />• Drawing C-10: Revised profiles for Haul Roads 1 and 2. <br />• Drawing C-11: Revised profiles for Haul Roads 3 and 4. <br />• Drawing C-12: Revised typical haul road sections. <br />• Drawing C-14: Corrected proposed weir elevation to Elevation 6106. <br />We anticipate that the information provided will satisfy the permit application requirements. Please <br />contact me if you have any questions or need any further information. <br />Sincerely, <br />Paul Swenson <br />Vice President <br />Attachment <br />Enclosures <br />PTS/ss 1 <br />PAMpls\06 CO\26\06261003 MCC Refuse Pile Site Review & Permit\WorkFiles\Permit Application\Response to Comments\2010-02-10\Response <br />Submittal Documents\2010-03-19 Barr Response Letter.doc