My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-26_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2010-03-26_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:02:43 PM
Creation date
3/29/2010 10:32:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
3/26/2010
Doc Name
Adequacy Comment Responses
From
Mountain Coal Company
To
DRMS
Type & Sequence
TR120
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Barr Engineering Company <br />March 19, 2010 <br />4700 West 77th Street • Minneapolis, MN 55435-4803 <br />Phone: 952-832-2600 • Fax: 952-832-2601 • www.barr.com An EEO Employer <br />BARR Minneapolis, MN • Hibbing, MN • Duluth, MN • Ann Arbor, MI • Jefferson City, MO • Bismarck, ND <br />WCOMM <br />Kathy Welt <br />Mountain Coal Company MAR 2 6 2010 <br />West Elk Mine Dv"a of Rai <br />P.O. Box 591 mwftg V'W <br />Somerset, CO 81434 <br />Re: Response to Comments <br />West Elk Mine (Permit No.C-1980-007) <br />Technical Revision No. 120 (TR-120) <br />Refuse Pile Expansion East <br />Dear Ms. Welt: <br />This letter has been prepared in response to comments received from the Colorado Division of <br />Reclamation, Mining and Safety (CDRMS). Comments were received in February 10, 2010 and <br />March 11, 2010 letters from Tom Kaldenbach of CDRMS. The following responses were prepared <br />and revisions made to the TR-120 application to address the items identified in the above-mentioned <br />CDRMS letters. <br />1. CDRMS Comment: We are waiting for verification from the State Historic Preservation <br />Officer (SHPO) that the proposed refuse disposal area on private land will not adversely <br />affect a place that is listed on or is eligible for listing on the National Register of Historic <br />Places. This verification from the SHPO is required by Rule 2.07.6(2)(e)(i). Should <br />additional site surveys be necessary, the Division will consider the possibility of approving <br />TR-120 with the stipulation that the surveys and SHPO clearance be provided before <br />disturbance occurs. We requested verification from the SHPO in a letter dated January 11, <br />2010. <br />Response: Mountain Coal Company will respond to this comment. <br />2. CDRMS Comment: Please extend the areas shown on Maps 54C and 54D southward so that <br />all proposed new disturbance is shown. <br />Response: Mountain Coal Company will respond to this comment. <br />3. CDRMS Comment: Please revise Map 54C to show details of the sediment and drainage <br />control features so they are consistent with those shown on Drawing C-13 of Exhibit 82, and <br />use the same symbol scheme and line weights as shown on Map 54C in the Main Surface
The URL can be used to link to this page
Your browser does not support the video tag.