My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-18_REVISION - M1977285 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2010-03-18_REVISION - M1977285 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:04 PM
Creation date
3/26/2010 8:33:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
REVISION
Doc Date
3/18/2010
Doc Name
Response to technical adequacy comments
From
Denison Mines
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Additional design information including detail drawings and specifications for the <br />installation of the PVC geomembrane ore pad liner systems at the Sunday Mines <br />Group is provided in Attachment S. <br />6.1.2 Evaluation of the Proposed Environmental Protection Facilities <br />The proposed EPFs will incorporate necessary control systems (i.e. berms and <br />geomembrane liner) to contain surface water run-off for the 100-year, 24-hour storm <br />event. Stormwater run-on will be diverted around the ore storage pad areas by the <br />perimeter berms. <br />The EPFs will be inspected and maintained as described in Section 5 and 6 of the <br />SWMP, included as Attachment F. All necessary protective measures will be kept in <br />effective operating condition. Any EPFs that are not adequately maintained in <br />accordance with good engineering, hydrologic, and pollution control practices are <br />considered to be no longer operating effectively and will be modified or replaced. <br />As outlined in the SWMP, if a spill of pollutants threatens stormwater at the site, the <br />spill response procedures outlined below will be implemented in a timely manner: <br />¦ The Mine General Superintendent will be notified immediately when a spill, <br />or the threat of a spill, is observed. The superintendent will assess the situation <br />and determine the appropriate response. <br />¦ If spills represent an imminent threat of escaping erosion and sediment control <br />facilities and entering the receiving waters, facility personnel will respond <br />immediately to contain the release and notify the superintendent after the <br />situation has been stabilized. <br />¦ The Mine General Superintendent, or his/her designee, will be responsible for <br />completing the spill reporting form and for reporting the spill to the <br />appropriate state or local agency. <br /> <br />6-2 <br />T:WMSDeruson Mines\Task Order4 - EPP Sunday Mines Gnxw-Van4ISunday kbres GmuOMRMS RTC (Round 2) and Revised EPPTINAL DRMS Report RTCv2 - EPP Sunday Mines.dw
The URL can be used to link to this page
Your browser does not support the video tag.