Laserfiche WebLink
• 15.0 Construction Quality Assurance Quality Control <br />Plan <br />Adequate Quality Assurance/Quality Control (QA/QC) will be conducted in <br />accordance with manufacturer's instructions. Exhibit 15-1 provides the standard <br />specifications for 30-mil non-reinforced PVC geomembrane liner used in buried <br />applications in accordance with ASTM D 7176. <br />Exhibit 15-1 PVC 30 mil Geomembrane Liner Specifications Used in Buried Applications <br />• <br />Certified Properties ASTM Standard Value <br />Thickness D-5199 30 +/- 1.5 mil <br />Tensile Properties <br />Strength at Break <br />Elongation <br />Modulus at 100% D-882 Min <br />73 Ibs/in <br />380% <br />32 Ibs/in <br />Tear Strength D-1004 Min 8 Ibs <br />Dimensional Stability D-1204 Max Ch 3% <br />Low Temperature Impact D-1790 Pass -20 de F <br />Index Properties ASTM Standard Value <br />Specific Gravity D-792 Typical 1.2 cc <br />Water Extraction (Percent Loss <br />Max D-1239 Max Loss 0.15% <br />Volatile Loss (Percent Loss Max) D-1203 Max Loss 0.7% <br />Soil Burial <br />Break Strength <br />Elongation <br />Modulus at 100% G-160 Max Chg <br />5% <br />20% <br />20% <br />Hydrostatic Resistance D-751 Min 100 psi <br />Shear Properties ASTM Standard Value <br />Shear Strength D-882 Min 58.4 Ibs/in <br />Peel Strength D-882 Min 15 Ibs/in <br />Prior to installation of the liner, a QC inspector will verify that the surface bedding of <br />the liner has been smoothened and freed of all sharp rocks (all rock and stone greater <br />than 1 inch diameter), objects, vegetation, and other miscellaneous debris. <br />Immediately prior to the placement of backfill, the geomembrane, seams, and non- <br />seam areas will be visually inspected by a QC inspector for defects, holes, or damage <br />due to weather conditions or construction activities. At the QC inspector's discretion, <br />the surface of the geomembrane liner will be brushed, blown, or washed as necessary <br />if the amount of dust, mud, or foreign material inhibits inspection or functioning of <br />the overlying material. All damage to the geomembrane liner will be repaired prior to <br />the placement of backfill. Detailed QA/QC requirements are provided in the technical <br />specifications provided in the design for DRMS review and approval. Technical <br />specifications are included as Attachment S. <br />Denison will provide a certification by a professional engineer or other appropriately <br />qualified professional that will confirm that the facilities were constructed in <br />accordance with the approved design plan. <br /> <br />15-1 <br />T:164986Denison Mines%Tesk Order 4 - EPP Sunday Mines Graup-VanASunday Mines GroupWRMS RTC (Round 2) and Revised EPPIFINAI ORMS Report RTCv2 - EPP Sunday MlnesAoo