My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-18_PERMIT FILE - M2009094
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009094
>
2010-03-18_PERMIT FILE - M2009094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:58 PM
Creation date
3/25/2010 4:06:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009094
IBM Index Class Name
PERMIT FILE
Doc Date
3/18/2010
Doc Name
Response to preliminary adequacy review letter
From
Asphalt Constructors, Inc.
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E 2 of 3 <br />i . Can <br />7D40 W. Hwy 160 AlamoW Cc 61:101 (719)W94611 <br />The vegetation and seeding rates for all soil types are: <br />SPECIES <br />Alkali Sacaton <br />Prairie Cordgrass <br />Baltic Rush <br />Greasewood <br />Inland Saltgrass <br />Rubber Rabbitbrush <br />Western Wheatgrass <br />RATE (PLS /AC) <br />0.60 <br />1.40 <br />0.40 <br />0.30 <br />1.00 <br />0.20 <br />0.50 <br />The availability of the seed is good. The seed types are native to the San Luis <br />Valley area. <br />It will take one to two days to plant the seed. Seeding will be done using a <br />broadcast method, or drilling if necessary. The best time to plant will be in the <br />spring from April 1 to June 30 or in the fall from August 1 to October 31. No <br />mulch or fertilizer will used for planting the new seed. No trees or shrubs will be <br />planted. <br />(e) Reclamation will be done on any 3 acre area within 12 months after <br />disturbance is complete. <br />(i). Reclamation of each phase is expected to be a continual process once <br />the initial 3 acres is disturbed. <br />(ii). The size of Phase I reclamation will be 19.57 acres, Phase II <br />will be 35.92 acres and Phase III will be 33.89 acres. <br />(iii). The sequence of reclamation will be: <br />1. Lay slopes back during extraction at a 3H:1 V slope. <br />2. Seed following 12 months of no mining in any 3 acre area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.