Laserfiche WebLink
30' To U4 Ceen?e <br />Pre-Mining and Mining Plan <br />LEGEND <br />----- Direction of mining operation <br />Pre-Disturbed mining area <br />Area to be used for mining, processing <br />And stockpiling of materials <br />0,0 <br />CCU* <br />Access road <br />Stockpile of topsoil and subsoil <br />? X Property Boundary <br />Areas reclaimed <br />li GOD <br />INS <br />1. Mining and systematic reclamation will be in phases <br />Proceeding west from pre-disturbed site. A slope of 4:1 <br />will be maintained during mining to prepare for reclamation. <br />2. The lower floor of the pit will be the normal area for <br />Stockpiles of processed materials and for processing <br />Plants. <br />3. Barb wire fence is located one foot inside property line of <br />Permitted area. <br />0'78 114 Corner 4. Contour elevations are approximate. <br /> <br />200.; 1 0 200 400 <br />SCALE OF FEET