My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-19_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-03-19_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
3/22/2010 1:10:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/19/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: 02/28/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth $ Environmental <br />50 to 250 feet right of centerline. Slope contouring was performed using various CAT dozers. <br />Material generated as the cut progressed was pushed down the slope. <br />D) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road near stations A28+00 (+/-) to A36+00 <br />E) Cut to Fill <br />1) VLF <br />A CAT 385 excavator, a CAT 375 excavator, and a John Deere 850 excavator were used to <br />excavate structural fill material from the following areas: between stations A7+50 (+/-) and <br />A23+00 (+/-), approximately 200 to 300 feet right of centerline; between stations 1-12+00 (+/-) <br />and H18+00 (+/-), approximately 125 feet left of centerline to 100 feet right of centerline; <br />between stations H26+00 (+/-) and H31+00 (+/-), approximately 75 to 150 feet left of <br />centerline; and between stations J12+00 (+/-) and J22+00 (+/-), approximately 100 to 300 feet <br />left of centerline. The structural fill material was loaded into CAT 777 haul trucks and hauled <br />to fill areas. <br />Prior to structural fill placement existing fill areas were ripped and frost was allowed to thaw <br />or was removed. Existing fill temperature were monitored and found to be above 32°F before <br />fill placement. An AMEC representative monitored ambient temperatures on an hourly basis <br />during fill placement. Fill temperatures were monitored during ambient temperatures below <br />32°F and averaged 33°F to 40T. <br />Structural fill was placed in the following areas: between stations Al 1+00 (+/-) and A23+00 <br />(+/-), approximately 200 to 300 feet left of centerline: between stations A52+00 (+/-) and <br />A57+00 (+/-) , approximately 0 to 175 feet left of centerline; between stations 1-18+00 (+/-) and <br />H14+00 (+/-), approximately 50 to 100 feet right of centerline; H26+00 (+/-) and H30+50 <br />(+/-), approximately 25 feet left of centerline to 75 feet right of centerline; J3+00 (+/-) and <br />J10+00 (+/-), approximately 0 to 200 feet right of centerline; and between stations J12+00 (+/-) <br />and J22+00 (+/-), approximately 200 to 300 feet left of centerline. Structural fill was placed in <br />18" to 24" lifts using various CAT dozers. Each lift was moisture conditioned using a CAT <br />773 water truck (when necessary) and compacted using a 10-ton vibratory smooth drum <br />compactor, passing over the entire fill surface at least 4 times (method compaction technique is <br />applicable). Ambient and fill temperatures were monitored and recorded during fill placement. <br />Blast pattern drilling was performed between stations 1-12+00 (+/-) and H6+00 (+/-), <br />approximately 50 to 100 feet right of centerline. Blasting was performed on Tuesday <br />(3/2/2010) and Saturday (3/5/2010). No blasting was performed Monday (3/1/2010), <br />Wednesday (3/3/2010), Thursday (3/4/2010), and Saturday (3/6/2010). <br />VLF Weekly Report WE 03.06.10.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.