added to the circuit and will provide power for the ADR as part of the MLE Project in the <br />event of power failure to line power supply system. <br />The potential total amount of solution in circulation will be about 29,100 gpm, distributed <br />equally between the Phases I, II, III and IV VLF and associated PSSAs and the Phase 5 <br />VLF and PSSA. At any one time, the amount entering the ADR for gold recovery will be <br />no more than approximately 17,000 gpm. Water balances associated with the Phases I, <br />II, III and IV VLF and associated PSSAs have been previously approved under <br />Amendment No. 8 for up to 19,000 gpm of solution application. This MLE presents <br />information in Section 6.0 to support an average solution application at a rate of <br />approximately 16,000 gpm (maximum - 19,000 gpm) at Phases I, II, III and IV VLF and <br />a maximum solution application at a rate of approximately 10,000 gpm at Phase 5 VLF. <br />The water balance model for the MLE Project specifies total maximum flows within the <br />all phases of the VLF at about 29,100 gpm. <br />Cyanide addition to the enrichment solution circuit will be into the discharge header of <br />the four 800 horsepower pumps prior to delivering the solution to Phase 5. The <br />concentration of cyanide in the enrichment solution will be approximately 120 to 150 <br />ppm. Cyanide addition will utilize the existing infrastructure in the ADR with minor <br />piping required to reach the enrichment discharge header. <br />Lime addition to the ore at the crushing circuit will provide pH control for the enrichment <br />solution. It is anticipated that between about 10 and I I pounds of lime per ore ton will be <br />added. Alkalinity from the Phase 5 enriched pregnant solution will be transferred into the <br />barren solution being applied to Phases I through IV. <br />7.1 See attached revised drawing <br />7.2 No change from Amendment No. 9 Permit Application <br />TR 58 Revision - March, 2010 Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />7-5