Laserfiche WebLink
Chapter 6 RECLAMATION PLAN <br /> Post-mining use rangeland <br /> When initiated Phased reclamation, concurrent w/ operations. <br /> Earthwork Slopes 3:1 where possible. <br /> Performance standard: (undulating slopes, overall 2:1 slope, <br />stable soils, etc.) <br /> Equipment type Dozer, loader, grader <br /> Revegetation <br /> Performance standard (ex., native species, cover density <br />similar to undisturbed areas, % capable of reproduction) <br />See Reclamation Procedures (Montezuma County, Tozer Pit <br />Expansion, Free Use Permit : Stipulation #11;pgs 25, 26) <br /> Seed Application See above <br /> Monitoring? See above <br /> Weed management See above <br /> Reports to BLM Prevention Use Plan (weed treatment, annually), Production <br />(quarterly?), <br /> <br /> Reclamation Bond? Not required by CDRMS <br /> Vegetation standards <br /> seed mix <br /> range status? <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />