My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-19_REPORT - C1994082 (9)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1994082
>
2010-03-19_REPORT - C1994082 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:02:10 PM
Creation date
3/19/2010 12:02:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REPORT
Doc Date
3/19/2010
Doc Name
2009 Annual Reclamation Report
From
Seneca Coal Company
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2009 <br />Yoast Mine C-94-082 Seneca Coal Company, LC <br />Mine Name Permit # Permitee <br />• <br />• <br />Address: 37796 Routt County Road #53, P.O. Box 670, Hayden, CO 81639 <br />M/ i? <br />Ylt <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date (March 319 and selety <br />agreed upon by the Division. It should include text, discussion, and maps, at a minimum, in addition to any <br />other reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. ears Land Status Category Cumulative Total The Calendar Year Cumulative Total' Last Acres disturbed 848.6 0.0 848.6 <br /> <br /> <br />Acres backfilled and graded 821.1 0.0 821.1 <br />Acres topsoiled 818.5 0.0 818.5 <br />Seeding typically begins the minimum 10-year liability period. Please report the acres for each category <br />below. Do not include acres that have achieved final, Phase III release. <br /> Last Years This Calendar Cumulative 10 Years or Greater than <br /> Cumulative <br />Year <br />Total' <br />Less <br />10 Years <br /> Total <br />Acres Seeded* 809.8 0.0 809.8 809.8 0.0 <br />*Include if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 848.6 and the total number of acres: <br />Phase 1 released 173.0 Phase II released 0.0 Phase III released 0.0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed NA <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities2 27.5 <br />Acreage in active mining areas3 0.0 <br />'(exclude acres where Phase III release has been achieved) <br />2Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion <br />and collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and <br />construction areas; office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal <br />conveyors; refuse piles and coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and <br />entryways; and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
The URL can be used to link to this page
Your browser does not support the video tag.