My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-18_REVISION - P2008043
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008043
>
2010-03-18_REVISION - P2008043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:02 AM
Creation date
3/19/2010 7:27:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
3/18/2010
Doc Name
Fourth Review
From
DRMS
To
Powertech (USA) Inc.
Type & Sequence
MD3
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Letter to Richard Blubaugh 2 March 18, 2010 <br />Centennial Project, 4 h Review of MD-03 File No. P-2008-043 <br />b. Costs for the option of deploying a fifth tank have been added. <br />c. An engineering cost has been added to cover the expense of pump test data evaluation prior to <br />injection as required under MD-03 and by the EPA Underground Injection Control Program. <br />Powertech may not commence operations proposed in MD-03 until the above listed issues have been <br />resolved, bond in the amount of $63,670.00 has been submitted, and Powertech is notified in writing that the <br />bond has been accepted by the DRMS. <br />If you have any questions, please contact me at 303-866-3567, ext. 8143. <br />Sincerely, <br />Allen C. Sorenson <br />Reclamation Specialist <br />enclosure(s) <br />cc: Michael Beshore, Powertech, via email, w/ enclosures <br />cAacs files\My Documents 4-19-06 thru\centennial 4 h review of modification md3 p2008O43.doc
The URL can be used to link to this page
Your browser does not support the video tag.