Laserfiche WebLink
Agency or organization name : Colorado Division Of Mining, Reclamation And Safe <br />Permit or other job action : Permit Renewal RN-05 <br />Task description :Replace topsoil from stockpile to drill pads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 perday <br />Source of estimated volume: MR-126 <br />Source of estimated swell factor : CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION xxxx <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (Ind-rf) <br /> Push gradient : 0.83 (Cat HB) <br />Average push gradient : 8.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,370 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.36 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 405 <br />380.41 <br />1,521.63 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 0.46 Hours <br />Unit cost : $0.538 /LCY Total job cost : $374 <br />xx;