My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-22_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-02-22_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:54 PM
Creation date
3/18/2010 3:32:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/22/2010
Doc Name
CIRCES Cost
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
User <br />TAK <br />Site : West Elk Mine Filename : 0007-078 <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Semi-Universal <br />ROPS Cab <br />Shiftbasis : 1 per day <br />3-shank ripper <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume <br />Area : 1.71 acres Rip depth (ft) : 2.00 Volume <br />NA feet/second Unadjusted production <br />NA cu. yds./hour per selected method <br />2.00 feet/pass Site altitude <br />7.67 feet/pass Altitude adjustment <br />200.00 feet/pass Job efficiency factor <br />88.00 feet/minute Net job correction <br />0.25 minutes/pass <br />0.838 acres/hour Adjusted unit production <br />BCY <br />BCY or CCY <br />Source of estimated quantity : MR-125 <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />JOB TIME AND COST <br />Z702.54 cu. yds./hour Adjusted fleet production <br />NA <br />5,518 <br /> <br />2,702.54 cu. yds./hour <br />6,300 feet <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />2,243.11 cu. yds./hour <br />8,972.44 cu. yds./hour <br />Fleet size : 4 dozer(s) Total job time : 0.61 hours <br />Unit cost : $0.095 per cu. yd. Total job cost : $522
The URL can be used to link to this page
Your browser does not support the video tag.