Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATIO MT-),State Task #: 08C CO/o :Colorado <br />Date : 08/09/2007 ounty :Gunnison <br />User : TAK Site : West Elk Mine <br />Agency or organization name : DRMS <br />Permit or other job action : TR-108 <br />Task description : Grade <br />HOURLY EQUIPMENT COST <br />on borrow area of Monument dam <br />Basic machine : CAT 14H <br />measures <br />Horsepower: 215 <br />Attachment no. 1 : NA Shift basis : 1 per day <br />Attachment no. 2 : Multi-shank ripper <br />Data source : (CRG) <br />Source of estimated acreage : TR-108 submittal, Drawing C1.9 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees <br />Effective blade length : 12.10 feet <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Permit/job #: C-80-007 <br />Abbreviation :none <br />Filename :0007-08c <br />* at 0 degrees, blade is perpendicular <br />to direction of travel. <br />** width of ripper beam on ripping applications <br />Job Condition Correction Factors Source <br />Average site altitude : 7,350 feet Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency adjustment factor : 0.85 (1sh1d, mod.) <br />Net job correction : 0.8500 multiplier