My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-22_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-02-22_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:54 PM
Creation date
3/18/2010 3:32:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/22/2010
Doc Name
CIRCES Cost
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : TR-109 <br />Task description : Rip Deer Creek Shaft pad and access road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Dozer operating cost/hour : $98.84 100 <br />Ripper operating cost/hour : $7.51 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $212.05 Total fleet cost/hour : $212.05 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume <br />Area : 1.90 acres Rip depth (ft) : 1.00 Volume : 3,065 BCY or CCY <br />Source of estimated quantity : MR-342 submittal: 0.84 acres of roads + 6 acres of well pads <br />Source of estimated load factor :NA <br /> <br />HOURLY PRODUCTION X. X <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,083.21 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 8,000 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 0.95 (Cat HB) <br />Average ripping length : --k00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.79 multiplier <br />Average maneuver time : 6.25 minutes/pass <br />Production per unit area : 0.646 acres/hour Adjusted unit production : 1,642.61 cu. yds./hour <br />Unadjusted production : 2,083.21 cu. yds./hour <br />Adjusted fleet production : 1,642.61 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 1.87 hours <br />Unit cost : $0.129 per cu. yd. Total job cost : $396 <br />NA <br />BCY
The URL can be used to link to this page
Your browser does not support the video tag.