My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-22_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-02-22_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:54 PM
Creation date
3/18/2010 3:32:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/22/2010
Doc Name
CIRCES Cost
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HOURLY PRODUCTION ixx: <br />sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 21.00 LCY <br />Material description : Heaped volume : 31.00 LCY <br />Earth - Dry packed Average volume : 26.00 LCY <br />Rated payload : 75,000 pounds Adjusted capacity : 26.00 LCY " <br />Payload capacity : 29.41 LCY hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : <br />Scraper loading time * : 1.00 minutes <br />Maneuver and spread time : 0.60 minutes <br />* load time per scraper pair on push-pull models <br />Job Condition Corrections : Site altitude (ft.) : 6,300 <br /> Scraper Push dozer Source <br />Altitude adj.: 1.000 NA (Cat HB) <br />Job efficiency : 0.830 NA (Cat HB) <br />Net correction : 0.830 NA <br />Travel time : <br />Road condition description : Rutted dirt little maintenance, no water, 1 " tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)"" <br />1 2,000 -10.00 4.00 -6.00 2192 0.98 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.98 minutes <br />Return route : <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 1.89 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 4.47 minutes <br />Unadjusted unit production/hour : 697.45 LCY/hour *** Adjusted for job conditions : 578.89 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 578.89 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 578.89 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 7.32 Hours <br />Unit cost : $1.001 /LCY Total job cost : $4,240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.