My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-22_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-02-22_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:54 PM
Creation date
3/18/2010 3:32:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/22/2010
Doc Name
CIRCES Cost
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
User : TAK Site : West Elk Mine <br />Filename :0007-165 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Pull up material for Light Use Road reclamation <br />HOURLY EQUIPMENT COST <br />Source of estimated volume: Exhibit 69, Table 2 <br />Source of estimated swell factor : CAT Handbook <br />......................................................... <br />HOURLY PRODUCTION ::::::..................................................................................................................................................... <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : BELOW AVERAGE <br />Secondary job condition within basic description <br />Cycle time value <br />Bucket Capacitv <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />2.25 LCY (heaped) Bucket size class <br />0.85 Hard, tough clay (80% - 90946) <br />1.91 LCY <br />Job Condition Correction Factors <br />Site altitude : 6,100 feet Altitude adjustment <br />Job efficiency adjustment <br />Net job correction <br />Unadjusted hourly unit production : 294.23 LCY/hour <br />Adjusted hourly unit production : 244.21 LCY/hour <br />SEVERE <br />0.39 minutes <br />medium <br /> Source <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />Adjusted hourly fleet production : 244.21 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 108.77 hours <br />Unit cost : $0.563 per LCY Total job cost : $14,947
The URL can be used to link to this page
Your browser does not support the video tag.