My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-22_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-02-22_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:54 PM
Creation date
3/18/2010 3:32:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/22/2010
Doc Name
CIRCES Cost
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action : Permit Renewal RN-05 <br />Task description :Backfi/Yregrade DMEA powerline road <br />..........::::::: :.......................................................... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal _ <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Source of estimated volume: MR-240 <br />Source of estimated swell factor : CAT Handbook <br />_...._...:... :;:;.:..........._............<::;:.;.;;: <br />HOURLY PRODUCTION Job Condition Correction Factors .Source <br />Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 15.00 % () <br />Average site altitude : 6,350 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.67 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.24 <br />Adjusted unit production : 294.50 LCY/hr <br />Adjusted fleet production : 1,177.99 LCY/hr <br />Total job time : 0.30 Hours <br />Unit cost : $0.695 /LCY Total job cost : $249
The URL can be used to link to this page
Your browser does not support the video tag.