Laserfiche WebLink
Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $204.53 <br /> <br /> <br />MATERIAL QUANTITIES .. .................. <br />.............. <br />........................... <br />Initial Swell Loose <br />volume : 1,613 CCY factor : 1.165 volume : 1,879 LCY <br /> <br />Source of estimated volume : DRMS estimate of 2 acres X 6 inches deep (based on MR-327) <br />Source of estimated swell factor : DRMS estimate <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,700 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.39 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 833.27 LCY/hr <br /> Adjusted fleet production : 833.27 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 2.26 Hours <br />Unit cost : $0.245 /LCY Total job cost : $461