Laserfiche WebLink
Agency or organization name : Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Regrade 0.45-acre drill pad approved in MR-320 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cost/hour : $98.84 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cost/hour : $204.53 <br /> <br />:::::.:::::::::::..................... <br />MATERIAL QUANTITIES <br />.................... ....... ......................................................:.................................. <br />.................................................................. <br />Initial Swell Loose <br />volume : 363 CCY factor : 1.165 volume : 423 LCY <br />Source of estimated volume: Map 1, TR-102 submittal <br />Source of estimated swell factor :DRMS estimate <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />2.00 % (pos) <br />6,700 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shift/day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.97 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.38 <br />Adjusted unit production <br />Adjusted fleet production <br />807.85 <br />807.85 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.52 Hours <br />Unit cost : $0.253 /LCY Total job cost : $107