Laserfiche WebLink
Agency or organization name : Colorado Division Of Mir <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Replace topsoil from <br />HOURLY EQUIPMENT COST <br />Reclamation And Safety <br />to drill pads approved in TR-100 <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower : 405 <br />Shiftbasis : 1 per day <br />volume : 4,300 CCY factor : 1.125 volume : 4,838 LCY <br /> <br />Source of estimate d volume : Division estimate based on TR-100 submittal <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,750 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 350.93 LCY/hr <br /> Adjusted fleet production : 350.93 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 13.78 Hours <br />Unit cost : $0.583 /LCY Total job cost : $2,819 <br />