Laserfiche WebLink
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Compact Main Access Road backfill material <br />;:.:<. » .::..:::::.............................................................................................. <br />HOURLY EQUIPMENT COST <br />Machine description : CAT 825G Series 11(2005) Horsepower : 339 <br />Compactor type : Soil - tamping foot Shift basis : 1 per day <br />volume : 12,167 LCY factor : 0.875 volume:- 10,646 CCY <br />Source of estimated volume :b <br />Source of estimated shrinkage factor : CAT Handbook <br />HOURLY PRODUCTION <br />Unadiusted houriv production = (W x S x L x C) / P <br />Compacted width per pass (W) <br />Average compactor speed (S) <br />Compacted thickness of each lift (L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />Unadjusted hourly unit production <br />Job Condition Correction Factors <br />Site altitude : 7,000 feet <br />8.67 feet <br />4.00 mph <br />12.00 inches <br />16.3 (5,280 ft./12 in./27 cu.ft.) <br />5 passes <br />1,356.68 CCY/hr <br />Altitude adjustment factor <br />Job efficiency factor <br />Net job correction <br />Adjusted hourly unit production <br />Source <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />1,126.05 CCY/hr <br />Adjusted hourly fleet production : 1,126.05 CCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 9.45 hours <br />Unit cost $0.152 per CCY Total job cost : $1,616