My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-17_REVISION - C2006085
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2006085
>
2010-03-17_REVISION - C2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:56 PM
Creation date
3/18/2010 1:31:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
REVISION
Doc Date
3/17/2010
Doc Name
Memo & Cost Estimate
From
Jim Stark
To
Kent Gorham
Type & Sequence
TR1
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Generic 8-10 cy, 6x4 $63.61 2 $127.23 $127.23 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $127.23 $127.23 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Canon City <br />Transportation Cycle Time : Non- Total one-way travel distance : 10.0 miles <br />Roadable Roadable Average travel speed : 35.0 mph <br />Equipment Equipment <br />Haul time (hours) = 0.29 0.29 <br />Return time (hours) = 0.29 0.29 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 1.57 0.57 <br />$848.03 <br />$72.70 <br />Total non-roadable mob/demob cost' <br />two round trips with haul rig <br />Total roadable mob/demob cost "" <br />.' one round trip, no haul rig <br />JOB TIME AND COST Total job time : 3.14 hours <br />Total job cost : $921
The URL can be used to link to this page
Your browser does not support the video tag.