Laserfiche WebLink
PROJECT IDENTIFICATION <br />Agency or orgai <br />Task #: 076 <br />Date : 0311712010 <br />User : JRS <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />iization name: Colorado Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job # : C-2006-085 <br />_ County:Fremont Abbreviation :none <br />Site :Northfield Mine Filename :C085-076 <br />sheet 1 of 2 <br />Permit or other job action : Technical Revision 1 <br />Task description : Clean Sediment Pond 1 <br />HOURLY EQUIPMENT COST <br />Truck/loader team -Truck :Generic 7-8 cy, 4x4 <br />-Loader : Cat 320C <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 excavate NA NA NA NA <br />% Utilization-machine : 100 100 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $9.37 $26.97 NA NA NA NA <br />Operating cost/hour : $22.44 $32.00 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $22.29 $38.72 NA NA NA NA <br />Unit subtotals : $54.11 $97.69 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $205.90 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : <br />_. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,800 LCY factor : NA volume : <br />$205.90 <br />1,800 LCY <br />Source of quantity take-off :Exhibit V; Division Estimate <br />Source of estimated swell factor :NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2, 700 pounds/LCY Struck volume : <br />Descr.:Earth - Wet excavated Heaped volume : <br />Rated payload : 20,300 pounds Average volume : <br />Payload capacity : 7.52 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />7.00 LCY <br />8.00 LCY <br />7.50 LCY <br />7.52 LCY <br />6.36 LCY <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 5,400 <br />Rated capacity (nom. heaped) : 1.630 LCY Truck Loader Source <br />Descr.:Loose material -mixed moist aggregates (95-100 Altitude adj.: 1.000 0.900 (Cat HB) <br />Bucket fill factor : 0.975 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 1.589 LCY Net correction : 0.830 0.747 <br /> <br />Shift basis : 1 per day