Laserfiche WebLink
Percent Different <br />(Sum of Parts 100. <br />versus Whole) 100.0% 100.0% 100.0% 121.5% 121.4% 1 % <br />Assumptions <br />1 <br />Volumes calculated using both TINs and Grid Reserve by subtracting the <br />TOPO_PMT_091016.OOT from TOPO_SITEDESIGN_091016v2.00t and <br />TOPO_PMT_091016.tp from TOPO_SITEDESIGN_091016v2.tp. <br />2 The PMT design is based on adding the excess (swelled) material from the site <br />construction to the original surface. <br />3 All material is spoil. <br />4 No swell <br />5 1 foot of topsoil replaced. <br />6 112,565 Icy of the original fill material did not have to be rehandled during <br />reclamation aradino. <br />14