My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-18_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2010-03-18_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:57 PM
Creation date
3/18/2010 1:31:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
3/18/2010
Doc Name
Second Adequacy Response
From
Peabody Energy
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Percent Different <br />(Sum of Parts 100. <br />versus Whole) 100.0% 100.0% 100.0% 121.5% 121.4% 1 % <br />Assumptions <br />1 <br />Volumes calculated using both TINs and Grid Reserve by subtracting the <br />TOPO_PMT_091016.OOT from TOPO_SITEDESIGN_091016v2.00t and <br />TOPO_PMT_091016.tp from TOPO_SITEDESIGN_091016v2.tp. <br />2 The PMT design is based on adding the excess (swelled) material from the site <br />construction to the original surface. <br />3 All material is spoil. <br />4 No swell <br />5 1 foot of topsoil replaced. <br />6 112,565 Icy of the original fill material did not have to be rehandled during <br />reclamation aradino. <br />14
The URL can be used to link to this page
Your browser does not support the video tag.