Laserfiche WebLink
to be clarified). Pre umari l , the intention is that the cut slope in co mpetent <br />material would not be tpiled or seeded, but this reeds to be clarified. <br />3. Pstmining !� a !� <br />Topography and Permanent Channel and Pond Watersheds Map <br />exhibits will reed to e revised to incorporate the slide rem diati n topography <br />a nd drainage modifications prior to revision approval. <br />4. de specifications intended for the short tributary channel that enters P l-� -3 <br />The ex <br />from the south at the approximate location of Cross Section J3 are not addres <br />s e p r vide desig n clarification and a YPM... designation for the ch annei <br />segment. <br />Please contact me if you have any questions. <br />Sin( <br />Darr <br />Environmental Protection Specialist <br />C: Danger File <br />