Laserfiche WebLink
TABLE 49A <br />Soil Stockpile Summary <br />• <br />i s <br />STOCKPILE ID <br />CURRENT VOLUME <br />VOLUME TO BE ADDED <br />TOTAL VOLUME <br />FCB -1 <br />7,400 <br />0 <br />7,400 <br />FCB -2 <br />350 <br />0 <br />350 <br />FCB -3 <br />170 <br />0 <br />170 <br />FCVF -1 <br />345 <br />0 <br />345 <br />SSS -1 <br />1,980 <br />0 <br />1,980 <br />RDT -1 <br />810 <br />0 <br />810 <br />W WTF -1 <br />4,000 <br />0 <br />4,000 <br />SF -1 <br />54,840 <br />0 <br />54,840 <br />SF -2 <br />55,860 <br />0 <br />55,860 <br />SF -3 <br />109,410 <br />295 <br />109,705 <br />SF -4 <br />3,635 <br />0 <br />3,635 <br />SF -5 <br />700 <br />1,450 <br />2,150 <br />SF -6 <br />96,540 <br />445 <br />96,985 <br />SF -7 <br />38,700 <br />0 <br />38,700 <br />SF -8 <br />4,100 <br />0 <br />4,100 <br />SF -9 <br />5,800 <br />0 <br />5,800 <br />SF -10 <br />325 <br />0 <br />325 <br />SF -11 <br />100 <br />0 <br />100 <br />PPSP -1 <br />6,300 <br />120 <br />6,420 <br />PPSP -2 <br />4,170 <br />0 <br />4,170 <br />SF- 12,13,14 <br />154,880 <br />0 <br />154,880 <br />SF -15 <br />0 <br />805 <br />805 <br />SF -16 <br />0 <br />2,200 <br />2,200 <br />SF -17 <br />0 <br />890 <br />890 <br />CRDA - I A -C <br />0 <br />233,590 <br />233,590 <br />TOTAL <br />550,415 <br />239,795 <br />790,210 <br />EASTERN MIN ING DISTRICT <br />Dewatering Borehole <br />7,225 <br />0 <br />7,225 <br />Dewatering Treatment Pond <br />includes access road <br />0 <br />6,295 <br />6,295 <br />Ventilation Site <br />4,765 <br />0 <br />4,765 <br /># 7 North Escape Shaft <br />2,220 <br />0 <br />2,220 <br />TOTAL <br />14,210 <br />6,295 <br />1 20505 <br />NORTHERN MINING DISTRICT <br />Power Borehole <br />0 <br />5,700 <br />5,700 <br />Ventilation Shaft & Road <br />0 <br />2,550 <br />2,550 <br />18RT Shaft & Road <br />0 <br />6,600 <br />6,600 <br />6MN Shaft, Road, & <br />Reservoir" <br />0 <br />23,700 <br />23,700 <br />TOTAL <br />0 <br />38,550 <br />38,550 <br />WESTERN MINING DISTRICT <br />(1) The volume listed for SF -12, 13, and 14 is split between the three stockpiles, as shown on Map 29 <br />(2) The volume listed for the 18RT Shaft and Roads is split among four stockpiles, with volumes being split roughly <br />40/30/15/15 percent beginning at the shaft pad and running back along the access road to the stock -pond location. Stockpile <br />locations are shown in Exhibit 8S. <br />0 (3) The volume listed for the 6MN Shaft, Roads, and Reservoir is split among four stockpiles, with volumes being split roughly <br />40/30/15/15 percent, beginning at the shaft pad stockpile and running back along the access road to the NW Mains Vent <br />Shaft. Stockpile locations are shown on Map EX16E -M1. <br />TR09 -70 11/16/09 <br />18LT Shaft & Road <br />0 <br />13,550 <br />13,550 <br />18LTPipeline <br />0 <br />12,150 <br />12,150 <br />TOTAL 0 <br />25,700 <br />25,700 <br />(1) The volume listed for SF -12, 13, and 14 is split between the three stockpiles, as shown on Map 29 <br />(2) The volume listed for the 18RT Shaft and Roads is split among four stockpiles, with volumes being split roughly <br />40/30/15/15 percent beginning at the shaft pad and running back along the access road to the stock -pond location. Stockpile <br />locations are shown in Exhibit 8S. <br />0 (3) The volume listed for the 6MN Shaft, Roads, and Reservoir is split among four stockpiles, with volumes being split roughly <br />40/30/15/15 percent, beginning at the shaft pad stockpile and running back along the access road to the NW Mains Vent <br />Shaft. Stockpile locations are shown on Map EX16E -M1. <br />TR09 -70 11/16/09 <br />