NMD (Panels 12 -Right through 16- Right, PR 99 -05) <br />TCC will continue to mine the reserves it controls in the Twentymile Park Basin. The mine moved operations into <br />• the NMD as shown on Map 23, Mine Plan Map. TCC controls all of the coal required to mine in this area. TCC <br />projects annual coal production at up to 10 million tons per year. <br />TCC uses the longwall mining method as the primary technique for assuring maximum recovery of the resource. In <br />the NMD, plans call for a 1,000 -foot wide face, with panel lengths ranging from approximately 13,600 to 17,000 <br />feet. The gate- roads, main and sub -mains will be developed by continuous miner, as is the current practice. <br />NMD (14 -Right Gate -road Alternate Location, MR O1 -171) <br />TCC evaluated whether or not the 1,000 -foot wide face could be increased to approximately 1,200 feet or wider. In <br />general, the outcome of the evaluation limited the face width to something less than 1,200 feet. In order to <br />accommodate the uncertainty associated with this evaluation, and initiate the start of the gate -road, an area is shown <br />in red on Map 23 and 23 B for potential areas in which the 14 Right Gate -road will be started. <br />NMD (Panels 17 -Right through 21- Right, PR03 -06) <br />The mine continues its operation into the NMD as shown on Map 23, Mine Plan Map. TCC has projected annual <br />coal production to increase from the current levels to a maximum of approximately 12 million tons per year. <br />TCC uses the longwall mining method as the primary technique for assuring maximum recovery of the resource. In <br />Panels 17- through 21- Right, mining continued in the NMD during this permit term with a 1,000 -foot wide panel <br />and panel lengths ranging from approximately 10,900 to 15,700 feet. The gate - roads, main and sub -mains were <br />developed by continuous miner, as is the current practice. <br />• NMD (Panels 21 -Right through 24 -Right (24 -Right Partial), PR06 -07) <br />The mine will continue its operations to the geologic /economic limits of the NMD as shown on Map 23, Mine Plan <br />Map. TCC projects ongoing annual coal production of up to approximately 12 million tons per year. <br />TCC uses the longwall mining method as the primary technique for assuring maximum recovery of the resource. In <br />Panels 21- through 24- Right, mining will continue in the NMD during this permit term with a 1,000 -foot wide <br />panel and panel lengths ranging from approximately 9,500 to 15,700 feet. The gate- roads, main and sub -mains will <br />be developed by continuous miner, as is current practice. <br />WESTERN MINING DISTRICT (WMD) <br />WMD (Panels 12- through 20 -Left, and 13- and 14 -Left Inby, PR06 -07, PR09 -08, TR07 -63, TR08 -64, TR09- <br />68, TR09 -71) <br />TCC will continue to mine the reserves it controls in the Twentymile Park Basin. Preliminary (Phase 1) <br />development of the WMD was initiated under PR06 -07 and TR07 -63 to facilitate extension of mine ventilation and <br />support facilities for both the northern portion of the NMD, and the new WMD into the Northern Mining District as <br />shown on Map 23, Mine Plan Map. TCC controls all of the coal required to mine in these areas. TCC projects <br />annual coal production at up to 12 million tons per year. In preparation for future mining in the WMD, TCC has <br />proceeded with initial (Phase I) Phase II, and Interim Phase III development of the main and sub -main entries for <br />Panels 13 -Left through 17 -Left, as shown on the Mine Plan Map, Map 23. Phase I through Interim Phase III <br />development will result in extension of development in the 18 -, and 17 -Left gate -roads to their furthest western <br />limit, partial development of the 16 -, 15 -, 14, and 13 -Left gate- roads, and full development of the 97' and 10 -North <br />• Mains. Development of the 18 -, and 17 -Left gate -roads will extend into the new Federal coal lease (COC- 72980) <br />at the western edge of the WMD. Full development and longwall mining under PR09 -08 will extend development <br />TR09 -71 2.05 -2.1 11/18/09 <br />