Laserfiche WebLink
Rockdust Distribution System <br /> Mine Communications System <br /> Personnel First Aid and Safety Equipment <br /> Personnel Carriers <br /> Shield Roof Support Carriers <br /> Supply Tractors and Trailers <br /> Lubrication Trailers <br /> Maintenance Equipment and Supplies <br /> Front End Loaders <br /> Haulage Trucks <br /> Dozers <br /> Motor Grader <br /> Water Truck <br /> Boom Truck and Fork Lifts <br /> Utility Trucks and Light Vehicles <br /> Air Compressor <br /> Welders <br /> Generators <br /> Light - Plants <br /> Pumps <br /> EASTERN, NORTHERN, AND WESTERN MINING DISTRICT <br /> The same mining methods utilized at the existing Foidel Creek Mine will be used to mine coal from the Eastern, <br /> Northern and Western Mining Districts. The only significant differences will be longwall panel length and <br /> width, i.e. approximately 10,000 - 20,000 feet in length compared with original panel length of approximately <br /> 10,000 feet, and 1,000 — 1,200 feet wide compared to the original panel width of approximately 640 feet. <br /> The existing surface facilities, including the bathhouse, offices, shop /warehouse, coal stockpiling and handling <br /> systems, and coal loadout will continue to be used for mining coal from the Eastern, Northern and Western <br /> Mining Districts. In order to support mining in the EMD and NMD, a dewatering facility (the 10 -Right <br /> Dewatering Installation) was constructed, and five fans (Zero Entry, EMD Fan Installation (2 fans), NW Mains <br /> Ventilation Fan, and 18 -Right Ventilation Fan) installed. The location of the new support systems are shown on <br /> Map 23, Mine Plan, and Maps 17 and 17A and Maps 18 and 18A, Premine Soils and Premine Vegetation, <br /> respectively, and these systems are described in greater detail in the following sections. In order to support <br /> continuing and future mining in the NMD and WMD, a second dewatering borehole (10 -Right Borehole 2) was <br /> developed, and three new shafts and associated support facilities (6MN and 18 -Left (2 shafts) Installations) were <br /> completed. <br /> EMD (Panels 2 Right through 6 Right, PR 97 -04) <br /> The same mining methods utilized in the EMD will be used to extract the coal from the remainder of the EMD. <br /> The existing surface facilities, including the EMD ventilation sites, will be used for mining of coal in the new <br /> five -year permit area. Presently, no new surface facilities are planned in support of the mining that is to occur in <br /> the remainder of the EMD. <br /> NMD (Panels 12 Right through 16 Right, PR 99 -05) <br /> The same mining method utilized in the EMD will be used to extract coal from the NMD, except that the face <br /> width is increased to 1000 -foot. The existing surface facilities, including the EMD ventilation site, will be used <br /> for mining of coal in the NMD permit area. <br /> • <br /> PRO 9-08 2.05 -11 04/10/09 <br />