Laserfiche WebLink
SILOAM STONE, INC. <br />BEDROCK MINE #1 <br />M-1 997-086 <br />MARCH 12, 2010 <br />PAGE 2 <br />(2) No reclamation was required but as in the past we continue to <br />cleanup the pre-law disturbed area by filling, graded, and <br />shaped the areas around the perimeter of the area. We have <br />approximately 48,400 cy of topsoil saved for reclamation, <br />located in around the mined area (brown). At this time there <br />are 4.33 acres t (green) that are partially reclaimed. The <br />third growing season starts this year and the grasses are <br />growing as expected. <br />(3) We will continue to remove stone from the slab stone mining <br />area and stockpiled stone in the stone yard. If needed, we <br />expect expand the slab stone mining in to areas adjacent to <br />where we mined this year. The stone yard area is industrial <br />area and would need no reclamation if mining ended prematurely. <br />We continue to add and remove stone from the TSSA's as market <br />demands dictate. <br />(4) Reclamation is being completed as required in the permit, we <br />are within the bonded limits set in 2009. we will reclaim any <br />areas that are in their final configuration as mining pro- <br />gresses this year. Seeding will be completed as new areas are <br />resoiled. <br />(5) The current contact for this operation is: <br />Mr. Matt Mueller <br />Siloam Stone, Inc. <br />315N7thSt. <br />Canon City, CO 81212 <br />Phone # (719) 275-4275 <br />The effective date of all information contained <br />March 09, 2010. A check for $791.00 is attached to <br />annual fee for 2010 and the 2009-2010 Annual Report <br />the areas discussed in this report. If you have any <br />please call me at the above phone number. <br />Respectfully Submitted, <br />Siloam Stone, Inc. <br />f <br />Matt eller <br />enclosure <br />d herein is <br />cover the <br />Map reflects <br />questions <br />cc Environment, Inc. <br />file